What are the boundaries of a land plot and what are they like?
In the process of forming a land plot as an independent unit to which there is or is allocated a right
land plot on the map of Rosreestr
When is a donation agreement required to be certified by a notary and how much does it cost?
Article updated: December 24, 2021 Mitrofanova SvetlanaLawyer. Work experience - 15 years Hello.
How to divide a personal account in a municipal apartment?
How to divide a personal account in a municipal apartment: rules for division by agreement and through the court
The need to pay expensive utilities for an apartment often becomes the cause of controversial situations that sometimes arise
The main documentation includes PPR and POR. The demolition project or DPR is one of the main documents for dismantling. It belongs to the category of mandatory organizational and technical documents and has a serious technological component. The PPR lists and technically justifies all demolition work, from preparatory work to complete cleanup of the territory and its improvement. The PPR also describes: • the basis for its development; • justification for choosing the demolition method; • criteria for choosing methods and methods of work; • a list of objects being demolished, for example, if a factory complex is being demolished this will be a list of workshops and auxiliary buildings; • list of measures to complete the operation of the facility(s) and safely decommission it; • information about approvals that have been or require approvals from the relevant authorities on the use of potentially dangerous technical solutions and methods of demolition, for example, explosive; • list of measures to ensure safety for workers, the environment and/or residents of adjacent areas; • plan or diagram of the demolition site with adjacent objects, territories, the building being dismantled, regular and temporary utility networks and structures; • justification of protective equipment and methods for protecting utilities and networks; • assessment of the degree of probability of damage to above-ground and underground infrastructure networks during the demolition of a building; • areas dangerous due to the collapse or scattering of debris, dust, gases, etc.; • measures to preserve and/or protect green spaces; • plans and measures for partial or complete reclamation of soil cover at the site; • technological maps of the sequence of equipment dismantling and demolition schemes; • forecasts, calculations and justifications for hazardous areas obtained from the proposed dismantling methodology; • measures to prevent people from entering hazardous parts or areas of the demolition site or into the premises of the demolished facility; • information about utility networks and communications remaining after demolition; • decisions on the removal or processing/disposal of scrap and materials from a demolished structure or building; • measures for the safety of citizens living in houses or workers in buildings adjacent to the demolition site, by notifying them or organizing a cordon, and, if necessary, evacuation. The second main and important part of the project documentation for the demolition of the facility is the POR - work organization project. The ERP is being developed in accordance with the new Town Planning Code of the Russian Federation and Law 340-FZ. It introduced a new concept - “demolition of a capital construction project” by its destruction, disassembly and/or dismantling. Only members of the SRO (self-regulatory organization) can carry out demolition project work. The POR is developed for the entire complex of demolition work of a large enterprise, for example, from several workshops and for each workshop or building separately. The ERP must take into account the risks of changing weather conditions, the degree of crowding of the demolition site, the proximity of existing production, public buildings or housing, busy transport routes, etc. The ERP includes the following work: • to disconnect external utility networks from the dismantled object and plug the remaining ones; • for the installation of temporary paths for the access and movement of vehicles around the site; • fencing the danger zone with lockable transport gates and gate(s) for workers; • to protect the surrounding area and objects from dust and dirt generated on the roads; • delivery of bunkers (containers) for collecting building materials and waste; • on preparing equipment for the safety of dismantling buildings; • installation of scaffolding, scaffolding, personal insurance for workers and protection of equipment, machinery and existing standard utilities; • to ensure gas and fire safety using fire destruction methods and many others. etc.
Form KS-10. Act on the assessment of buildings, structures and plantings subject to demolition
Purpose of KS-10 In a situation where there are any buildings, plantings and other buildings on a plot of land
Citizens are asking the question: how to cancel temporary registration before the deadline and withdraw from it at the place of stay?
January 3, 2019 Registration of a temporary registration for a relative or an outsider in the future forces the owners
Temporary registration
Temporary registration in 2021 - how to apply step by step
If you have temporarily moved from your permanent place of residence to a new one - for example, you have arrived
How the demolition of five-story buildings of unbearable series is carried out: latest information
How the demolition of five-story buildings of unbearable series is carried out: latest information
When demolishing five-story buildings of unbearable series, fresh information comes both from the press service of the Moscow urban planning service,
Passport of a citizen of the Russian Federation
Temporary and permanent registration: what is the difference? Is it possible to have two at the same time?
What does registration give? First of all, the state itself needs registration for citizens. She
Types of violations of land boundaries and ways to eliminate them
Violation of the boundaries of a land plot should be understood as a change in the initially established boundaries of the land plot. Violation
What is the difference between HOA and housing cooperative: legal and accounting aspects
In short, no. The entry of the owner of the premises into the HOA is his right and occurs
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]