12/05/2021 Latest news. The Moscow government on its official website determined the order of relocation to new housing for participants in the renovation program, the Vedomosti newspaper reported with reference to the official website of the Moscow mayor. The resettlement takes place in three stages - from 2021 to 2024, from 2025 to 2028 and from 2029 to 2032. If necessary, the resettlement dates can be adjusted “depending on the progress of construction, selection of sites, implementation of the wishes of residents expressed at public hearings,” stated in the message. “In the first stage, almost 170 thousand Muscovites living in 930 old houses will receive new apartments. In the second stage - from 2025 to 2028 - it is planned to begin relocating more than 1,630 houses, which means another 330 thousand Muscovites. The rest - about 380 thousand people - will move in the third stage, from 2029 to 2032. Then it is planned to resettle more than 1,800 houses,” the statement says. At the moment, 155 houses are in the process of resettlement, of which 27 have already been resettled and demolished. 60 houses have already been put into operation, another 172 houses are in varying degrees of construction readiness, 88 objects are at the design stage, the portal gogov.ru informs about whether compulsory vaccination can be abolished in the regions of Russia, is there a law (resolutions) on compulsory -voluntary vaccination and how to write a refusal to be vaccinated at work - read HERE
In addition, the published list contains houses for which the resettlement dates have not yet been determined - these are 688 houses. Urban planning documentation for these territories is being finalized. As soon as all documents are approved, residents of these houses will be separately informed about the timing of the move. More than 550 requests for additional purchase of space were received from Moscow residents under the renovation program, the Interfax agency reports, citing the press service of the Moscow Department of Urban Development Policy. “From the moment the relocation of houses participating in the renovation program begins, Muscovites have the right to purchase additional space with a 10% discount. In total, the Fund received 568 applications,” noted the head of the department, Sergei Levkin. He added that 535 complaints were received immediately at the time of relocation, and another 33 during the first two years after the residents moved. To date, 498 contracts have been concluded. The department reminded that the area of purchased housing should not exceed 100 sq.m., and the additional purchase can only be used once. You can purchase additional housing using your own funds or with a loan, as well as using government subsidies, certificates and maternity capital.
The housing renovation program was approved in August 2017. It concerns about 1 million Muscovites and provides for the resettlement of 5,174 houses until 2025. According to the portal renovatsija.ru, below is a LIST OF HOUSES FOR DEMOLITION AT MOSCOW ADDRESSES IN 2021 AND FOR THE PERSPECTIVE OF 2021:
House demolition schedule - addresses of buildings by Moscow districts
- Basmanny district
- Bakuninskaya st., vl. 60
- Poslannikov lane, ow. 18-Starokirochny lane, ow. 5
- Krasnoselsky quarter 998, 2/1, building 1,2
- Rusakovskaya st., 6
- Tagansky st. Melnikova, 2
- SAO
- Beskudnikovsky district, apt. 8, 9, building 1, 2
- Voykovsky district, Narvskaya st., ow. 5
- Golovinsky district, Avangardnaya st., ow. 10, Flotskaya st., vl. 68, buildings 1 and 2, Onezhskaya st., ow. 35, building 5, 6 and 7, Kronstadt Boulevard, ow. 55, Smolnaya st., ow. 21
- Western Degunino district, Angarskaya st., no. 33, Bazovskaya st., no. 15, st. Taldomskaya, vl.1
- District Koptevo, 3rd Novomikhailovsky Ave., ow. 8, building 1
- Timiryazevsky district, Astradamskaya st., vl. 9A, Dmitrovskoe highway, ow. 55
- NEAD
- Alekseevsky district, st. Staroalekseevskaya, ow. 3
- Butyrsky district, microdistrict. 78, room 66, st. Rustaveli, vl. 3, room 4
- Losinoostrovsky district, st. Izumrudnaya, ow. 26A, microdistrict 3, room 53, st. Taininskaya, ow. 13
- District Marfino, Gostinichny pr., vl.8, bldg. 2
- District Maryina Roshcha, st. Oktyabrskaya, vl. 1058, Sheremetyevskaya st., vl. 5, k.1, 13, k.1
- Rostokino district, st. Agricultural, building 14
- Sviblovo district, Nansen passage, ow. 8
- District Yuzhnoye Medvedkovo, st. Molodtsova, 33, building 1
- District Yuzhnoye Medvedkovo, Dezhneva proezd, 12, building 1
- VAO
- Bogorodskoye Millionnaya st., vl. 3
- Bogorodskoye district, microdistrict. 8B, room 4
- District Vostochnoye Izmailovo, 13th Parkovaya St., ow. 16, 15th Parkovaya st., ow. 27, 16th Parkovaya st., ow. 12
- Golyanovo Shchelkovskoe highway, 71, building 1 and 73
- Ivanovskoe district, microdistrict. 40-52, rooms 2 and 5
- Izmailovsky Ave., ow. 5
- Kosino-Ukhtomsky district, st. Black Lake, ow. 2-8, Orenburgskaya st., no. 3, Kaskadnaya st., ow. 21, plot 1 and 2
- Metrogorodok district, Otkrytoe highway, ow. 30, 26
- Perovo district, Plekhanova st., ow. 18, 22, 2nd Vladimirskaya st., ow. 30, Zeleny prospect, ow. 27-29
- Northern Izmailovo district, microdistrict. 80, bldg. 7 and 9, Konstantin Fedina st., ow. 13-19
- SEAD
- District Vykhino-Zhulebino, microdistrict. 129, Fergana st., no.5
- Kuzminki district, apt. 115, room 1710, building 18; sq. 116, buildings 1 and 2 (Shumilova St., 4); microdistrict 113, st. Young Lenintsev, ow. 42; microdistrict 119, Volgogradsky pr-t, ow. 163; microdistrict 120, st. Zhigulevskaya, vl. 3; microdistrict 120, st. Zelenodolskaya, vl. 28, room 4; microdistrict 118, st. Young Lenintsev, ow. 117, 99; microdistrict 117, st. Young Lenintsev, ow. 73
- Lefortovo district, Shepelyuginskaya st., building 16, apt. 3, room 6
- Lyublino district, microdistrict. A, Lyublinskaya st., 113; microdistrict Zh, Krasnodonskaya st., 46; microdistrict A, Lyublinskaya st., 109, building 1; microdistrict A, Lyublinskaya st., ow. 111, room 211; microdistrict Zh, st. Upper fields, 19, building 2
- Nizhny Novgorod district, apt. 80,
- Ryazan district, microdistrict. 128A, st. Papernika, 12
- District Tekstilshchiki, st. Chistova, ow. 3A, page 1
- Yuzhnoportovy district, microdistrict. D, st. Petra Romanova, 18
- Southern Administrative District
- Biryulyovo East district, microdistrict. Zagorye, opposite ow. 2
- District Biryulyovo Western, Bulatnikovsky Ave., 16A; Kharkovsky Ave., near vl. 1
- Danilovsky district, at the intersection of 5th Roshchinsky Ave. and 2nd Roshchinskaya Street; Projected passage 4062, no. 8
- Donskoy district, Sevastopolsky prospect, opposite No. 7,
- Nagatinsky Zaton district, st. Rechnikov, 18-20
- Nagatino-Sadovniki district, Varshavskoe highway, opposite 47, bldg. 2, opposite 61A
- Nagorny district, Simferopol Ave., ow. 712
- Tsaritsyno district, Yerevan st., opposite 10, building 1; Kavkazsky Boulevard, vl. 40-42; Kantemirovskaya St., opposite No. 27; st. Kantemirovskaya, ow. 37-41; Kaspiyskaya st., 28, building 4; Sevanskaya st., vl. 54-56; st. Bekhtereva, vl. 3, z/u1 (Tsaritsyno district, microdistrict 4, room 402)
- Chertanovo-Yuzhnoye district, microdistrict 26, room 81-82
- South-Western Administrative District
- Academic district, apt. 18, st. Shvernika, ow. 6
- District Zyuzino, apt. 35, B. Yushunskaya st., ow. 7A; apt. 14, Bolotnikovskaya st., ow. 31; sq. 36, Bolotnikovskaya st., vl. 48; sq. 37, Bolotnikovskaya st., vl. 43; sq. 14, room 3; , sq. 40, Kakhovka st., ow. 2313; sq. 37, Kerchenskaya st., ow. 2; sq. 40, Kerchenskaya st., ow. 20; sq. 42, Kerchenskaya st., ow. 30, 26; sq. 38, Sevastopolsky Ave., ow. 71, ow. 79; sq. 26, 31, Chernomorsky Boulevard, 22/2
- Konkovo district, microdistrict. 6, rooms 2 and 3
- Lomonosovsky district, st. Architect Vlasov, building 2
- Obruchevsky district, intersection of st. Garibaldi and st. Architect Vlasov
- Severnoe Butovo district, Feodosiyskaya st., vl. 7
- Cheryomushki district, apt. 20, 21, Garibaldi st., no. 17
- District New Cheryomushki, apt. 32A, uch. 12
- Cheryomushki district, apt. 20, 21, Profsoyuznaya st., ow. 32
- District Yuzhnoye Butovo, Krasnolimanskaya st., vl. 27
- Company
- Kuntsevo district, Molodogvardeyskaya st., 44
- Kuntsevo district, Bobruiskaya st., 15
- Mozhaisky district, apt. 71, 72, st. Kubinka, 18, building 2
- District Ochakovo-Matveevskoe, apt. 5, B. Ochakovskaya st.; microdistrict 1, Veernaya st.
- Solntsevo district, Shchorsa st., no. 15, st. Aviatorov, st. Rodnikovaya
- Filevsky Park district, Beregovoy proezd, ow. 2, ow. 2, p. 18, vl.2, p.19
- Fili-Davydkovo district, st. Kastanaevskaya, vl. 44-48, bldg. 1 and 2
- SZAO
- Mitino district, Novobratsevo district, Parkovaya st., ow. 31 (opposite)
- Northern Tushino district, apt. 5, Turistskaya st., vl. 14, k.1, 2; st. Vilisa Latsisa, ow. 42;
- District Khoroshevo-Mnevniki, apt. 83, Generala Glagolev st., ow. 5, room 1; st. Demyan Bedny, ow. 2215; Karamyshevskaya embankment, building 22, building 2; st. Mnevniki, ow. 10, building 1
- Shchukino district, microdistrict. 12, Novoshukinskaya st., ow. 8
- Zelenograd
- Kryukovo Zelenograd, Kryukovo district, microdistrict. No. 19, room 1935, room 1934
- Old Kryukovo Zelenograd, microdistrict No. 9, bldg. 934 – 936
- TiNAO
- Mikhailovo-Yartsevskoe village, village. Shishkin forest, near houses 9 and 21
- Ryazanovskoye village, village Banner of October, near 3
PLANS FOR HOUSE DEMOLITION FOR 2021-2022
Which houses are subject to demolition?
The reason for recognizing an apartment building as unsafe may be its complete or critical physical deterioration. A residential building can be included in such a list in accordance with the following procedure:
- An inspection of the house was carried out by a commission on the basis of an order initiated by its residents, a local government body or a housing supervision inspection. It is mandatory to involve specialists to assess the actual wear and tear of the structure.
- All elements of the building are subject to inspection: load-bearing structures, facades, roof, basements, etc. A house where the elements show signs of significant destruction will be considered unsuitable for living due to accidents, which creates a danger for citizens to live in.
- Based on the results of the conclusion issued by the commission, the head of the administration makes a decision to add the house to the list of emergency ones and subject to demolition. If the percentage of destruction is acceptable, it may be recommended to reconstruct the object.
- The signed decision is sent to the regional administration. Upon approval, the house is included in the program for improving the living conditions of citizens.
All citizens who, at the time the building is recognized as unsafe, are the owner or tenant of the premises in it, as well as registration, have the right to receive in return:
- new housing in accordance with sanitary standards for each person;
- compensation for the purchase of any other premises based on the standard cost per square meter established in the region.
Eastern District
List of houses for demolition for 2021 - 2021:
- Bogorodskoye: Millionnaya st., vl. 3;
- TPU “Open Highway”.
- 13th Parkovaya St., ow. 16;
- microdistrict 40-52, bldg. 2;
- st. Plekhanov, vl. 18;
- st. 15th Parkovaya, vld. 46A;
From 2022:
- Novogireevo: st. Morning, ow. 3.
- Perovo: 1st Vladimirskaya st., vl. 47;
- st. Metallurgov, 56.
Western District
Houses on the queue for 2021 - 2021:
- Kuntsevo: st. Molodogvardeyskaya, 44;
- st. Bobruiskaya, ow. 15.
From 2022:
- Mozhaisk district: st. Grodnenskaya, vl. 7-9;
- Vernadsky Avenue: Vernadsky Avenue, vld. 75/3;
- Solntsevo: st. Rodnikovaya, vld. 4/1.
Northern District
In the plan for 2021 - 2021:
- Beskudnikovsky district: apt. 8, 9, bldg. 1;
- sq. 8, 9, bldg. 20.
- Avangardnaya st., vl. 10;
2022:
- Beskudnikovsky district: Beskudnikovsky blvd., vl. 52;
- Dmitrovskoe highway, vl. 89.
North-Eastern District
For current and next years:
- Alekseevsky district: st. Staroalekseevskaya, ow. 3.
- Butyrsky district: microdistrict. 78, bldg. 66;
- st. Rustaveli, vl. 3, bldg. 4.
- Dmitrovskoe highway, ow. 167, bldg. 4A;
2022:
- Babushkinsky district: Ostashkovskaya street, vl. 9/2;
- Bibirevo: st. Belozerskaya, ow. 3-5;
- Butyrsky district: st. Milashenkova, ow. 7/3;
- Losinoostrovsky district: Taininskaya st., vld. 9/5;
- Maryina Roshcha: st. Annenskaya, vl. 6;
- Otradnoe: st. Olonetskaya, ow. 21.
Northwestern District
Houses subject to demolition in 2021 and 2021:
- Mitino: st. Parkovaya, vl. 31.
- Northern Tushino: microdistrict. 5, st. Turistskaya, vl. 14, bldg. 12.
- Khoroshevo-Mnevniki: apt. 83, st. General Glagolev, ow. 5, bldg. 1.
- Shchukino: microdistrict. 12, st. Novoshukinskaya, vl. 8/1.
- South Tushino: apt. 11, bldg. 1;
- st. Boat, ow. eleven.
From 2022:
- Khoroshevo-Mnevniki: emb. Novikova-Priboya, ow. 6/3/1;
- Demyan Bednogo st., ow. 17, bldg. 2;
Repair and finishing of new apartments
The demolition of five-story buildings in Moscow, how resettlement is taking place, where residents will be resettled are not the only pressing topics. An important role is played by the question of what the new housing will be like, its layout and decoration. The renovation project and the resettlement of Khrushchev-era residents at the initial stage aroused great distrust both among experts and Muscovites themselves. However, later the right of citizens to receive equivalent apartments with improved finishing, as well as other guarantees, was enshrined at the legislative level. The implementation of the renovation project was taken under personal control by mayor Sergei Sobyanin.
The new apartments will have a comfort-class finish so that any displaced person can start living in it without additional repairs. Its total cost will be about 11 thousand rubles per sq. m. m. The cost of new housing will be 25–30% higher than what was in the demolished Khrushchev building.
Within the framework of the question “renovation of five-story buildings: where will they be relocated”, one cannot ignore the topic of planning future apartments. You could get acquainted with it using visual models exhibited in the showroom at VDNKh already in July - August 2021. In total there are four types of layout with different numbers of rooms. During the Mosurbanforum 2017, Muscovites could see what the sizes of apartments, rooms and courtyards of new buildings will be. All details of the apartments' decoration were observed, right down to the electric stoves and door handles.
Central District
Houses subject to demolition in 2021 and 2021:
- Basmanny district: Bakuninskaya st., vl. 60;
- st. Baumanskaya, 47/1.
- sq. 998, d. 2/1, pp. 1, 2;
In 2022:
- Basmanny district: Bolshaya Pochtovaya st., vl. 61-67;
- Krasnoselsky district: Gavrikova st., vl. 3.
about the project
By 2032, it is planned to demolish 5,175 houses built in 1957-1968. People call them “Khrushchevkas”. To implement a large-scale project in Moscow, it is planned to create 489 launch sites, where 350,000 apartments with a total area of about 20 million m² will be built. More than 1 million residents of the capital will change their housing.
Demolition of five-story buildings - stages
Year | Number of houses | Number of residents |
2020-2024 | 930 | 170000 |
2025-2028 | 1630 | 330000 |
2029-2032 | 1800 | 380000 |
Since the beginning of the resettlement, 224 buildings have already been demolished, about 25 thousand Muscovites have moved into 77 newly built houses
By 2023, 308 new buildings should be built. In 2021, more than 30 thousand Muscovites will move from demolished houses, in 2022 - more than 43 thousand, in 2023 - already 55 thousand.
Southern District
Houses that are planned to be demolished between 2021 and 2021:
- Biryulyovo East: st. Zagoryevskaya, vl. 2/1.
- Biryulyovo Western: Bulatnikovsky proezd, 16a;
- Kharkovsky proezd, vl. 1/1.
- Yerevan st., ow. 6;
In 2022:
- Biryulyovo East: Kasimovskaya st., vl. 39, bldg. 2;
- Moskvorechye-Saburovo: Kashirskoe highway, vl. 76A;
- Nagatinsky Zaton: Sudostroitelnaya st., ow. 15;
- Nagorny district: Electrolitny pr-d, vl. 7A.
South-Eastern District
In this district, the following houses were subject to demolition, from 2021 to 2021:
- Vykhino-Zhulebino: Akademika Skryabina st., vl. 3.
- Kuzminki: apt. 115, bldg. 17;
- sq. 115, bldg. 18.
- microdistrict A, st. Lyublinskaya, vl. 113;
In 2022:
- Kapotnya: 1st quarter, vl. 8;
- 2nd quarter, ow. 21.
Houses that have already been demolished
There are already first results from the implementation of the program. As for the renovation, the demolition sequence is already close to completion at the initial stage. New residential buildings have been built on the site of demolished houses, vacant lots, irrationally located parking lots and other underused land plots.
Only houses with high architectural and cultural value, which will be preserved for future generations of Muscovites, have not been demolished. And as a general rule, the construction of residential premises in them is not provided. These are either commercial buildings or completely reconstructed buildings for administrative needs.
Demolished houses are land plots free for development and included in a comprehensive architectural and planning solution. This takes into account the construction or modernization of main communications with the expansion of recreational areas.
Southwestern district
The list has been approved for 2021 - 2021:
- Academic district: st. Novocheremushkinskaya, vld. 35;
- sq. 18, st. Shvernika, vld. 6.
- sq. 35, st. B. Yushunskaya, ow. 7A;
- microdistrict 6, bldg. 3;
- sq. 20, 21, st. Garibaldi, ow. 17;
Sample list for 2022:
- Academic district: st. Kedrova, ow. 16;
- Zyuzino: st. Odesskaya, vl. 4, p. 1;
- Konkovo: st. Vvedensky, vl.5;
- South Butovo: st. Krasnolimanskaya, ow. 21.
New Moscow
Houses to be demolished this and subsequent years:
- Mikhailovo-Yartsevskoe settlement, Shishkin forest village: owner. 9, building 1;
- ow. 21, building 1.
Principles of renovation
The demolition of old housing and the resettlement process is carried out according to the following principle (it is called wave):
- first, the starting object is built;
- the residents of the house demolished first move into it;
- A new building is being built to replace the one that was demolished, and the residents who are next to be demolished will move into it.
A similar principle was tested in Krasnoyarsk and received approval. Modern technologies are used during construction, the rented living space is ready for use. New housing should be located near the old one, accessibility to transport and infrastructure development should be taken into account.
Zelenograd
Addresses of houses that fall under the program in 2020-2021:
- Kryukovo District, Georgievsky Prospekt: bldg. 1934;
- bldg. 1935;
- bldg. 1936.
- bldg. 934;
One way or another, the renovation program in Moscow, planned for the period 2017-2025, will affect almost all districts (addresses) of the capital and the nearest Moscow region: Arbat, Basmanny, Zamoskvorechye, Krasnoselsky, Meshchansky, Presnensky, Tagansky, Tverskoy, Khamovniki, Airport, Beskudnikovsky, Voikovsky, Golovinsky, Dmitrovsky, Western Degunino, Koptevo, Left Bank, Molzhaninovsky, Savelovsky, Sokol, Timiryazevsky, Khoroshevsky, Alekseevsky, Altufevsky, Babushkinsky, Bibirevo, Butyrsky, Lianozovo, Losinoostrovsky, Marfino, Maryina Roshcha, Ostankino, Otradnoye, Rostokino, Sviblovo, Northern Medvedkovo, Northern, Southern Medvedkovo, Yaroslavsky, Bogorodskoye, Eastern Izmailovo, Vostochny, Golyanovo, Ivanovskoye, Izmailovo, Kosino-Ukhtomsky, Metrogorodok, Novogireevo, Perovo, Preobrazhenskoye, Northern Izmailovo, Sokolinaya Gora, Sokolniki, Vykhino-Zhulebino, Kapotnya, Kuzminki , Lefortovo, Lyublino, Nizhny Novgorod, Printers, Ryazan, Textile workers, Yuzhnoportovy, Biryulyovo East, Biryulevo Western, Danilovsky, Donskoy, Moskvorechye-Saburovo, Nagatino-Sadovniki, Nagatinsky Zaton, Nagorny, Tsaritsyno, Chertanovo Yuzhnoye, Academic, Gagarinsky, Zyuzino, Konkovo , Kotlovka, Lomonosovsky, Obruchevsky, Northern Butovo, Cheryomushki, Southern Butovo, Yasenevo, Odintsovo, Vnukovo, Kuntsevo, Mozhaisky, Novo-Peredelkino, Ochakovo-Matveevskoye, Vernadskogo Avenue, Ramenki, Solntsevo, Filevsky Park, Fili-Davydkovo, Mitino, Pokrovskoye -Streshnevo, Northern Tushino, Khoroshevo-Mnevniki, Shchukino, Southern Tushino, Kryukovo, Silino, Old Kryukovo, Vnukovskoye, Voronovskoye, Desenovskoye, Kievsky, Klenovskoye, Kokoshkino, Krasnopakhorskoye, Marushkinskoye, Mikhailovo-Yartsevskoye, Moskovsky, Mosrentgen, Novofedorovskoye, Pervomaiskoye, Ryazanovskoe, Sosenskoe, Troitsk, Filimonkovskoe, Shchapovskoe and Shcherbinka.
Mechanism for implementing the renovation program
The demolition and construction of new houses under the renovation program will be of a wave nature. This means that the first group of Khrushchev-era residents will be moved to starting residential buildings, after which the vacated houses will be demolished and new ones will be built in their place. Based on this, the question of how to find out where residents will be relocated under the renovation program becomes very relevant.
Despite the fact that the houses will be offered in the same area as the demolished five-story building, Muscovites can independently choose another part of the city to move to. This is available provided that there are vacant apartments in the desired area under the renovation program.
According to the terms of the renovation, each of the displaced people will be able to independently choose a house for relocation. Three options will be offered for this. Based on your personal preferences for the height of the object, the location of the apartment in it and other factors, you can choose the best option.