How can I find out if my house is included in the renovation program?

In 2021, by decision of the President of the Russian Federation, the Renovation program was restarted. The essence of the project is the dismantling of dilapidated and unsafe buildings in Moscow. Residents of Khrushchev-era buildings will be relocated to new monolithic or panel houses. They will be provided with a modern apartment with a glassed-in loggia, a spacious kitchen and a separate bathroom. Of course, almost every participant in the renovation is concerned about the question of when will my old house be demolished, because everyone would rather move from a crumbling building into comfortable housing.

Which houses will be demolished?

The bulk of the buildings on the list to be dismantled date back to the times of mass construction under Khrushchev. That is, these are five-story buildings built in the 50s and 60s. After the war, there was an urgent need to provide citizens with a roof over their heads, so, like mushrooms after rain, apartment buildings were hastily erected throughout Moscow. Several standard projects were developed, houses were built in record time, and the quality of raw materials left much to be desired.

The average lifespan of such buildings was twenty-five years ; it turns out that they had already outlived their “norm” twice as long . For this reason, such buildings will be demolished first. When determining the degree of emergency of a building, a special commission pays attention to the following factors:

  • Is there any deformation of load-bearing structures;
  • Whether or not communication systems are available;
  • How correctly and efficiently does ventilation function?
  • Are the temperature and humidity levels in the premises consistent with the norm?
  • What hidden health hazards are present in the building.

The inspection can be organized by the municipality or the homeowners themselves.

Houses of cultural and historical value

Those buildings that are of interest as houses of historical and cultural heritage deserve special attention. Among the total number of voters, more than 400 “Khrushchev” refused to participate in the renovation. Decisions on such houses were made by a working group with the participation of representatives of the Moscow Architecture Committee.

If you want to get an answer to the question “how to find out when my house will be demolished for renovation,” it is worth considering that if it is an object of historical and cultural heritage, then you can get such information using the Moscow City Hall portal mos.ru.

Demolition procedure

The government has not yet announced exact dates for the dismantling of buildings and resettlement of citizens. But it is already known in what order the emergency Khrushchev buildings will be demolished:

  • In North-East Administrative Okrug, twenty-eight houses will be dismantled in the fourth quarter of 2021;
  • In the Central Administrative District, three buildings will be dismantled by the end of this year;
  • In the South-Western Administrative District it is planned to demolish four five-story buildings;
  • At the JSC, twenty-seven Khrushchev-era buildings are subject to dismantling;
  • Six five-story buildings in North-West Administrative District will be demolished.

Also, by 2021, houses will be dismantled in the Northern Administrative District (Beskudnikovo, Koptevo), Eastern Administrative District (Northern Izmailovo), South-Eastern Administrative District (Kuzminki, Tekstilshchiki), Southern Administrative District (Nagatino), South-Western Administrative District (Kotlovka, Yuzhnoye Butovo).

By the way, in some areas not only five-story buildings will be demolished, but also nine-story ones. Although before this, the capital’s mayor stated that work would only be carried out on buildings consisting of five floors.

List of houses participating in the renovation program

A massive program of demolition and resettlement of five-story buildings began in the 1990s. the then mayor of Moscow Yuri Luzhkov. The demolition program was planned to be completed by 2010. But due to the crisis of 2008 and other reasons, the liquidation of the five-story buildings of the “demolished” series was not completed on time and in February 2021 it was decided to return to this topic. The current mayor of Moscow, Sergei Sobyanin, with the support of the President of Russia, launched a new program for the demolition of Khrushchev-era buildings. Before answering the question of how to find out whether a house is included in the renovation program (Moscow), it is worth clarifying which buildings are covered by the project.

In May-June 2021, residents of Khrushchev-era apartment buildings took part in the vote and decided whether they agreed to the demolition and resettlement of their houses. Participation in the renovation program is voluntary, and if the majority of apartments in a five-story building are in favor of liquidation, then such a residential property will take part in the demolition and relocation program for residents.

You can find out whether a house has undergone renovation using publicly available web services, for example, the Moscow City Hall portal mos.ru. In total, more than 5,000 houses in the capital are included in the renovation program, although the Moscow government initially approved a list of 7,934 houses.

At the same time, changes were made to the original list of houses. Thus, on October 3, 2021, another 37 houses were included in the renovation program, located in the following districts of Moscow: 11 houses in the Central Administrative District, 7 in the Eastern Administrative District, 5 in the North-East Administrative District, 4 in the South-Western Administrative District, one each in the Western Administrative District and the South-Eastern Administrative District, 8 - in New Moscow. At the same time, 4 houses were excluded from the renovation program at the following addresses: Budyonny Avenue, 28, building 1 (VAO); st. Tsiolkovskogo, 5 (JSC); st. Stavropolskaya, 15 (South-Eastern Administrative District) and st. Lodochnaya, 27, building 1 (SZAO). The list of houses to be included/excluded from the renovation program can be downloaded from the link (.pdf, 433 kb).

How long will the renovation take?

The program will last at least fifteen years. The dismantling and resettlement process will take place in several stages:

  • The first stage was completed in 2021. At this stage, lists of emergency and dilapidated premises to be demolished were compiled, and preliminary options for launch sites were selected;
  • The second stage was completed in early August 2021. Work with urban planning papers has been completed. This will allow resettlement to be carried out as quickly as possible;
  • The third stage will last until December 31, 2021. At this stage, all the nuances of the program should be finalized and detailed, indicating specific deadlines for the dismantling of Khrushchev-era buildings and relocation to new buildings.

Demolition schedule for five-story buildings

The capital city hall's portal already contains information about the list of five-story buildings being demolished under the renovation program. If you are looking for information on where to find out which houses are being demolished in Moscow, you can also do this on the website of the Moscow Mayor mos.ru. The renovation list involves the elimination of five-story buildings from the 1960s. buildings throughout Moscow. The implementation will mainly affect the following administrative districts of the capital:

  • CJSC – it is planned to demolish more than 530 objects
  • Northern Administrative Okrug – more than 400 five-story buildings are involved in the project
  • Southern Administrative Okrug - more than 350 Khrushchev buildings will be eliminated under the renovation program
  • SEAD - this district leads in the number of demolished houses; more than 600 buildings are included in the renovation program
  • North-East Administrative District – more than 500 objects are subject to demolition
  • South-Western Administrative District - in the district there are more than 450 houses participating in the renovation
  • SZAO – 340 “Khrushchev” buildings will be liquidated during the project implementation

The renovation program is designed for 15 years, but according to some experts it can last up to 20-30 years. Occupancy of the first house on 5th Parkovaya Street, 62B in the Eastern District of the capital under the housing renovation program began in February 2018.

When answering the question of how to find out whether a house is subject to renovation in Moscow, it is necessary to take into account the fact that some of the objects were decided to be liquidated under Mayor Yuri Luzhkov. The program developed under him involved a large number of objects of the so-called demolition series.

Correct resettlement

Any property owner had the right to vote “for” or “against” the inclusion of the house in the renovation. When the process of moving into a new building reaches your building, pay attention to a number of nuances:

  1. You should be offered several accommodation options to choose from;
  2. All documents for the apartment must be completed within two months;
  3. New housing should have almost identical footage;
  4. The house should be located in the same area as the dismantled Khrushchev building;
  5. They can offer you an apartment in another district only after they receive your written consent.

Also, do not forget that after inclusion in the program, you are exempt from paying for major repairs.

Didn't find the answer to your question? Find out how to solve your problem - call and consult with a lawyer: 8 (Moscow and Moscow Region from 9:00 to 20:00) Consultations are provided within the program free of charge.

Results of voting on renovation

Residents of those five-story buildings that were proposed for demolition and included in the preliminary demolition list could independently determine the fate of their home. To do this, it was enough to leave your vote on the “Active Citizen” portal, contact the capital’s “My Documents” MFC, or hold a general meeting of owners of the building’s premises.

At the moment, the question remains extremely relevant: whether the house was included in the renovation program after the vote. The votes of apartment owners have been collected and counted. The results of the vote on renovation are available for general review. Anyone can study the results obtained, for example, using the Moscow City Hall portal mos.ru. If you voted on the Active Citizen portal, you can check how your vote was taken into account there.

mos.ru provides a convenient and informative map showing the voting results. You can search for the desired object by entering its full address in the appropriate line or using the area overview. The map shows those houses that took part in the voting. Markers of different colors indicate whether the five-story building will be liquidated as part of the project: green - yes, red - no.

In addition, how to find out whether a house is included in the renovation program on the Moscow City Hall portal using the personal code received during the vote, you can also check whether your vote was counted correctly.

Official sources of information

The renovation program by many Moscow residents turned out to be highly anticipated, since a large number of people now live in apartments that should be considered not only obsolete, but also in poor and often unsafe condition for living due to the obsolescence of previously used construction technologies. For this reason, the desire to find out whether the house is included in the program arises among the overwhelming number of residents of five-story “Khrushchev” buildings and other types of houses whose construction dates back to the post-war period.

To obtain such information, you can turn to several types of sources, namely:

  • official portal of the mayor and the Moscow Government. This website has a separate section dedicated to the renovation program, and also has a special service for checking the inclusion of a particular house in the list of program participants;
  • if there is no opportunity to use the listed resources, you can contact directly the authorized units of the Moscow City Administration and, based on the results of drawing up a special request, receive an answer about when and in what form it is planned to participate in a renovation project (in accordance with federal legislation on renovation in participation in this program includes not only the resettlement and demolition of houses, but also the implementation of a major repair and reconstruction project regarding those houses that can be brought into proper condition by carrying out this type of repair without demolition);
  • Information on the implementation of the renovation program can also be obtained by calling the hotline. For the entire Moscow area the number. Each district also has its own information center, the number of which can be found on the official portal dedicated to the renovation program.

Using the listed sources to obtain information about the renovation program, you can also find out what the duration of the program will be for a particular district of Moscow.

Is it possible and how to refuse to participate in the renovation?

Along with the question of how to find out whether a house is being demolished in Moscow, the question of how to refuse to participate in the project is very relevant. According to the terms of the program, participation in renovation is voluntary. Residents of the houses themselves determine whether they agree to demolish the house and move to a new apartment. Five-story buildings were included in the project by decision of the majority, owners or tenants of housing, or rather, 2/3 or 66.67% of the total.

Along with this, if apartment owners for some reason want to refuse demolition after the house has been included in the program, they can do this subject to two conditions: - desire of 1/3 of the owners + 1 vote; — absence of owners with an already concluded relocation agreement.

The answer to the question of how to find out whether a house is subject to demolition (Moscow, renovation) will be links to the portals of the Moscow City Hall mos.ru, the Active Citizen website ag.mos.ru, the official website of the Moscow Construction Complex stroi.mos.ru. The same information can be obtained by contacting the Moscow branches of the MFC.

Author: Anastasia Goncharova Photo: Official portal of the Mayor and Government of Moscow / mos.ru

Rating
( 1 rating, average 5 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]