Features of the current renovation of the premises - everyone should know this


Current repairs of the premises - what is this according to the law?

What applies to current repairs? Current apartment repairs - what is this according to the law?

What is repair? Any property must be maintained by its owners (owners) in proper condition.

The provisions of the Civil and Housing Codes indicate that the owners of premises bear the burden of its maintenance. Therefore, if necessary, they must carry out the required repair work on them.

In addition, they participate in the costs of maintaining common property in a multi-storey building (hereinafter - MKD).

These include fees for routine scheduled repairs performed by service organizations. Persons occupying premises under lease agreements are given the obligation to carry out ongoing repairs.

More serious capital work is carried out by the owner. In this regard, the distinction between these activities is of great importance.

When assigning responsibilities for repairing premises, it is important to determine which actions belong to which type of repair. Civil and housing legislation does not answer this question.

The relevant information can be gleaned from the regulatory documents of the State Construction Committee of the Russian Federation:

  1. Resolution of the State Construction Committee of the Russian Federation dated September 27, 2003 N 170 “On approval of the Rules and Standards for the technical operation of the housing stock.”
  2. Methodological manual on the maintenance and repair of housing stock MDK 2-04.2004.

Differences between the two types of work

Summing up, we can draw the following conclusions: during the current repair of common property, work is carried out to partially restore the resource of the building, repair individual elements of the building in order to maintain the structures, elements and equipment of an apartment building in proper condition. In this case, repair work should not exceed 10-20% of the total area or specific gravity of the element being repaired. In turn, a major overhaul is aimed at eliminating malfunctions of worn-out structural elements of MKD with restoration or complete replacement of the elements in question. At the same time, during major repairs of structures and engineering systems related to the general property of the apartment building, at least 50% of each structure is replaced.

Let's give an example: the roof of a multi-apartment residential building is leaking, and the management company refuses to repair it, citing the fact that the developer built the house with numerous defects, in particular, did poor quality work on the roof waterproofing, and in order to eliminate the leaks, a major repair of the entire roof is required. In this regard, the management company refuses to carry out routine repairs.

Solution to the problem: if the area of ​​the roofing of an apartment building that needs to be repaired to eliminate the cause of the leak does not exceed 10-20% of the total area of ​​the roofing, then the management company is obliged to carry out routine repairs of the roofing. And in order to convince the management company to carry out routine repairs, the owners of premises in an apartment building, on the basis of clause 13, part II of the Decree of the Government of the Russian Federation of August 13, 2006 N 491 “Rules for the maintenance of common property in an apartment building,” have the right to enter into an agreement with an expert institution and conduct a construction and technical examination of common property, this service is provided by our institution - INDEPENDENT EXPERT PARTNERSHIP LLC. And if the expert’s opinion does not convince the Management Company, then the court will be able to protect your violated rights and force you to repair the roof. And as part of legal proceedings, you can apply for the appointment of a judicial construction and technical examination and entrust our expert institution to carry out the forensic examination.

List of works related to current repairs of the premises

What is current residential renovation?

It should be noted that there is no specific list of current repairs inside apartments (other residential premises). By definition, such actions are associated with eliminating problems that have arisen and improving the condition of the premises.

Such work should not make major changes to the premises, affect supporting structures, or involve a complete replacement of engineering equipment.

In-line work includes painting floors, walls, wallpapering, whitewashing ceilings, replacing plumbing fixtures, replacing windows, radiators, replacing pipes, repairing wiring and sockets. As for the repair of common premises and other property in the apartment building, here is an approximate list of such work.

According to the Rules approved by the State Construction Committee on September 27, 2003, the following types of work are considered continuous:

  • plastering and painting walls and ceilings;
  • restoration of floor coverings;
  • repair of stairs, fences, railings;
  • replacement and repair of door and window fillings;
  • filling potholes, cracks and crevices;
  • insulation of individual parts of premises during freezing;
  • repair and partial replacement of pipes, taps, mixers, pumps;
  • restoration of gas equipment;
  • repair of waste chute elements;
  • strengthening existing partitions;
  • replacement and repair of fans and other ventilation equipment;
  • replacement of lamps in entrances and common areas;
  • repair of faults in electrical networks.

And this is not all of the work provided for by these rules. Their full list can be seen in Appendix No. 7 of these Rules, Appendix No. 2 MDK 2-04.2004.

At the same time, apartment owners in apartment buildings, when concluding contracts with management companies, can determine specific types of work.

What applies to the common property of an apartment building?

The peculiarity of an apartment building is that in addition to the premises owned by the residents, there is common property , which is used by all owners on equal rights.

Read the article about which authorities you can contact if the Criminal Code does not fulfill its obligations.

Such property includes :

  • roof of the house;
  • entrances;
  • basements and attics;
  • elevators and shafts;
  • landings;
  • intercom and CCTV cameras if available;
  • mailboxes;
  • facade and foundation of the building.

By promptly for housing and communal services, each owner of an apartment in an apartment building has the right to routine repairs of the premises, as well as to restore the operation of faulty equipment that is part of the common property.

If the breakdown occurred in the apartment, then the direct owner of the premises must deal with the problem.

Who should carry out routine repairs?

As for routine work inside apartments (other premises), their owners (tenants) must independently carry out such work. For these purposes, they can also involve third-party organizations, but the repairs will still be carried out at their expense.

Repairs of apartment building property should be carried out by service organizations and (or) contractors attracted by them.

Depending on the chosen management method, HOA or management company:

  • develop a plan for ongoing repair work;
  • determine the procedure for their implementation;
  • conclude contracts for their implementation;
  • notify owners about the cost and scope of work.

Frequency and timing

When planning routine repairs, you should focus on damage occurring in the house, so it can be situational. However, as a rule, such repair activities have a certain sequence and are not spontaneous.

The frequency of work is determined based on full and partial inspections of premises and equipment that correspond to a pre-established schedule.

General inspections occur twice a year: in spring and autumn, but before the start of the heating season.

If during the inspection violations of the technical condition of the house and the surrounding area are revealed, they should be recorded in the inspection report. After drawing up this document, the service organization selects a contractor.

The timing of routine repairs in an apartment building depends on the following factors:

  • complexity of events;
  • scale of restoration work;
  • speed of work of contractors.

Answers to the most frequently asked questions

Answers on questions

The actions of service organizations for routine repairs of property common to apartment buildings always raise many questions. Next, we will look at the most frequently asked questions.

***

What ongoing work should be carried out by management companies? It should be repeated that approximate lists of works in MKD related to current ones are contained in Resolution of the State Construction Committee of the Russian Federation dated September 27, 2003 N 170, MKD 2-04.2004. In addition, a specific list of works is included in the contract with the management company. Therefore, first you should study the agreement concluded with the management company, and then other regulatory documents.

Who is responsible for organizing the work

The organization servicing the house is responsible for carrying out routine repairs:

  • management company (MC);
  • homeowners association (HOA);
  • housing construction cooperative (HBC).

For example, a house contract with a management company must contain separate provisions that regulate:

  • frequency of inspections of premises, as well as recording their results;
  • frequency of measures to repair common property;
  • list of works;
  • requirements for the timing of repairs, as well as for the organizations performing them.

Repair work is carried out by employees of contractors who have entered into an agreement with the company that services the apartment building.

The contractor can be selected based on the results of an announced competition by the HOA or housing cooperative. The service company must monitor the progress of the work and then accept the result.

conclusions

Carrying out routine repair work is necessary to maintain the satisfactory condition of the property and prevent its damage and wear.

Approximate lists of such work are established by the regulatory documents of the State Construction Committee. Owners resolve other issues independently by concluding agreements with management companies or contractors.

You can listen to the seminar on the topic “Maintenance and current repairs of common property of apartment buildings” in this video:

See also Telephone numbers for consultation Oct 27, 2021 kasjanenko 1068

Share this post

Discussion: 4 comments

  1. Lera says:
    01/11/2018 at 00:35

    During renovations, our neighbors installed a door in a load-bearing wall, without anyone’s permission, now our wall is also collapsing because of their door, what can be done in such a case?

    Answer

  2. 5master5 says:

    01/17/2019 at 21:31

    If the purchased apartment is in poor condition and the previous owner has not carried out routine repairs in it for thirty years, can a claim be made against him for this? Although the acceptance certificate was signed, it reflects the unsatisfactory condition.

    Answer

  3. Olga says:

    07/27/2019 at 01:42

    If a residential building does not belong to anyone in the city, but residents live in it, then who should carry out the repairs? We only pay for garbage, gas, water and electricity, we don’t pay for anything else.

    Answer

  4. Oleg says:

    03/19/2020 at 13:57

    I would like to understand what type of repair includes repairing damage caused by replacing communications during a major repair of communications. Who should repair cracks and holes in walls caused by pipe replacement? Is it the owner of the apartment or is it money from the capital repair fund?

    Answer

Where to complain about poor quality of repairs or inaction of the management company

If the repair fund is regularly replenished, an agreement with the service organization has been signed, but work to eliminate problems is not carried out, residents have the right to demand in writing that the service organization recalculate contributions.

In case of her groundless refusal, you can apply for a judicial solution to the issue.

When the inaction of the management organization leads to damage to common property, you can demand compensation for the damage caused.

If the renovation took place, but its quality did not satisfy the residents of the apartment building, it is necessary to study the clauses of the contract concluded with a third-party company. The document must establish a warranty period for the work performed and conditions for correcting defects.

When the contractor is not going to fix the faults, and the management company or HOA ignores the comments of the residents, they should:

  • draw up a written claim to the contractor and the management company, TZhS, housing cooperative;
  • contact;
  • write a statement to the prosecutor's office and the court.

More about where to complain about the management company.

What are the funds used for?

To maintain an apartment building in proper condition, certain funds . They are allocated monthly by apartment owners.

In the bills you can find an expense item related to the maintenance and repair of apartment buildings.

The amount of the monetary contribution under this article is established by the management company independently in accordance with the order of the district; in Moscow, this is Government Order No. 05-14-381/3 dated December 2, 2013.

Payment and cost

Services are paid for by the owners of the apartment buildings. Funds are collected when paying for housing and communal services. In the receipt, expenses are indicated in the column “Maintenance of common property.”

The cost is determined on the basis of a competition organized by the owners or management company. When concluding a contract with a repair organization, payment terms are specified.

Report

The management company reports every year to residents for the repairs of an apartment building. The Management Committee submits a report on the work done in the first quarter of this year. The management company has the right to report at other times, if this is specified in the MKD service agreement. The report must indicate the work and the amounts spent.

The management company is not obliged to report to one homeowner. For the report, it is necessary to conduct a general meeting of residents of the apartment building. Although some management companies provide such reports upon request to each tenant.

Financing difference

Financing all types of work is not an easy task. Depends on the type of work performed and the type of construction. A private home is repaired only at the expense of its owner. In an apartment building we are talking about the common property of the owners.

Article 44 of the Housing Code of the Russian Federation (LC RF) determined that at a general meeting of owners of a residential apartment building, a decision is made to carry out repairs and issues with financing are resolved. You should be aware of the significant differences characteristic of the material support for capital or routine repairs of common property in a multi-storey building.

The costs of ongoing work are low. They are made at the expense of funds transferred monthly by each owner of residential premises in the house, according to the column maintenance of residential premises. The money is accumulated in a special account of the management company and has a specific purpose - ongoing repair work. The account is replenished by income received from renting out part of the premises in the house, for example, shops on the ground floors.

80% of the money from the fund is spent on planned work, the rest is saved for unforeseen work.

Major repairs according to clause 2 of Art. 158 of the Housing Code of the Russian Federation is paid based on the decision made at the meeting of home owners. Representatives of the management company are present at the meeting and will outline a complete work plan. The rate for major repairs is determined at the level of government of the subject.

The fund is replenished by monthly contributions under the capital repairs column. The accumulated money supply becomes the basis for creating an estimate for repairs. State subsidies play an equally important role, although they are not always provided. The place where the fund is formed plays a big role. If this is a management organization, then the repairs are carried out only at the expense of the owners of the house; the management company is obliged to pay the bills. If she has the material and technical base, she can carry out the work independently. Transferring funds to a regional operator changes the order. The regional operator enters into an agreement with a contractor to carry out work.

When accounting for funds in the Management Company, they are divided by sources of financing. Accounting is different when transferring money from a budget organization or owners/tenants of premises in an apartment building. The tax accounting of funds received is also different. All accounting transactions can be checked for the purpose of open discussion of the results or progress of repair work.

Repair period

The legislation does not have clearly defined deadlines for carrying out repair work.

For example, when replacing part of the roof it will take a week, some activities can be completed in a day or two. In addition, there are factors that affect the timing of such work.

These include:

  • object requiring restoration;
  • repair production season;
  • contractor capabilities.

The same work carried out in winter and summer, in the first case, requires more time to implement. The periods for performing specific activities are specified in the agreement drawn up with the contractor.

Important! If the established deadlines are violated, the person has the right to appeal this action. You should contact the housing inspection or prosecutor's office, the courts.

Price list for cosmetic repairs

Navigation by prices:

  1. Preparatory
  2. Floors
  3. Walls
  4. Finishing interior partitions
  5. Ceiling finishing
  6. Decor
  7. Door openings, carpentry work
  8. Plumbing work
  9. Work on the heating system
  10. Work on the ventilation system
  11. Electrical work
  12. Other works

Preparatory

NamePrice per m2
Installation of temporary light sources, plumbing fixtures, sockets, communication structures (for an area of ​​up to 100 sq. m)9000 rub.
Installation of temporary light sources, plumbing fixtures, sockets, communication structures (area up to 200 sq. m)12000 rub.
Installation of temporary devices for lighting, plumbing, communication structures (area up to 500 sq. m)17000 rub.
Dismantling, descending stairs and loading waste from construction work (area up to 150 m3)675 RUR/m3
Dismantling, removal and loading of waste from construction work (area from 160 m3)400 rub/m3

Floors

NamePrice per m2
Dismantling works
Dismantling of cement screed up to 5 cm thick (with further removal and loading)315 RUR/m2
Dismantling of cement screed up to 80 mm thick (with further removal and loading)378 RUR/m2
Dismantling of parquet floors and panels, wooden floor surfaces (depending on the complexity of the work)35 RUR/m2
Dismantling linoleum15 rub/m2
Removing tiles72 RUR/m2
Removing skirting boards and platbands25 rub/m2
Removal of rough wooden floors55 RUR/m2
Installation work
Sound insulation (20 mm in 2 layers) with waterproofing film and gluing of joints225 RUR/m2
Thermal insulation of the floor surface using rolled cork (4 mm thick)270 RUR/m2
Insulation of the floor surface with polystyrene foam and mineral wool boards (thickness 50 mm with film vapor barrier)135 RUR/m2
Preparing a floor surface made of expanded clay concrete (up to 12 cm)810 rub/m2
Preparing the screed and leveling the surfaces495 RUR/m2
Priming concrete surfaces45 RUR/m2
Installation of a floor surface made of gypsum fiber sheet with bedding up to 60 m648 RUR/m2
Adding for every 5 cm of thickness153 RUR/m2
Reinforced screed (4 cm), laying tape along the edge513 RUR/m2
Reinforced screed (6 cm), laying tape along the edge567 RUR/m2
Reinforced screed (8 cm), laying tape along the edge711 RUR/m2
Waterproofing the floor surface with cement mortar270 RUR/m2
Laying tiles on the floor surface (one tone per prepared surface)630 RUR/m2
Laying tiles on the floor surface (with a complex pattern on the prepared surface)810 rub/m2
Additional fee when using large slabs135 RUR/m2
Additional fee when using small and different-sized tiles315 RUR/m2
Additional fee when forming a diagonal, organizing friezes, paths360 rub/m2
Decorating the floor surface with natural stone (thickness up to 2 cm)1350 rub/m2
Mosaic installation1166 RUR/m2
Installation of mosaics, pebbles with selection of patterns and shades1800 rub/m2
Installation of linoleum with gluing of joints320 rub/m2
Sticker of pile floor coverings (in rolls) with regular trimming225 RUR/m2
Additional fee for complicated pruning720 RUR/m2
Installation of carpet (in slabs)170 rub/m2
Installation of the laminate with the organization of the substrate on the prepared surface495 RUR/m2
Laying parquet with adhesive on a finished surface585 RUR/m2
Installation of large parquet boards with adhesive on a finished base900 rub/m2
Laying moisture-resistant plywood for parquet (dividing the sheet into four parts) on mastic and dowels180 rub/m2
Laying the bottom layer of plywood (two layers or more)315 RUR/m2
Installation of block parquet810 rub/m2
Installation of artistic parquet1710 RUR/m2
Sanding of block parquet with cleaning of areas450 rub/m2
Varnishing of piece parquet (for 3 rubles)180 rub/m2
Installation of skirting boards (up to 7 cm or more)180 rub/m.p.
Decoration of ceramic skirting boards225 rub/m.p.
Decorating plastic skirting boards155 rub/m.p.
Organization of straight abutment to other coverings (profile overlays)180 rub/m.p.

Walls

NamePrice per m2
Dismantling works
Dismantling plaster walls (in the bathroom, toilet, etc.)225 RUR/m2
Dismantling brick walls (thickness up to 2.5 cm, without reinforcement)2970 RUR/m2
Dismantling brick walls (thickness more than 2.5 cm, without reinforcement)900 rub/m3
Cutting load-bearing brick partitions without reinforcement135 rub/m.p.
Cutting concrete partitions (with dismantling and removal)450 rub/m.p.
Cutting load-bearing concrete walls630 rub/m.p.
Removing cement screed up to 5 cm (with further removal and loading)225 RUR/m2
Removing cladding from sheet or slatted materials and disassembling the frame90 rub/m2
Analysis of tile cladding45 RUR/m2
Stripping of film paints with surface notching90 rub/m2
Removing wallpaper45 RUR/m2
Dismantling of cabinets, niches, mezzanines made of wood270 RUR/m2
Dismantling of metal partitions and stained glass with glass removal, cutting and storage405 RUR/m2
Punching niches and openings in brick surfaces (without reinforcement) with garbage removal4500 rub/m3
Punching niches and openings in concrete surfaces (without reinforcement) with garbage removal7200 rub/m3
Cutting openings in load-bearing partitions made of concrete up to 2.5 cm thick (with sharp reinforcement)6750 rub/m3
Installation work
Reinforcing openings with metal fittings90 rub/kg
Installation of metal jumpers up to 1 m1125 RUR/piece
Creation of partitions from expanded clay concrete blocks702 RUR/m2
Ordinary masonry made of cellular concrete blocks4050 rub/m3
Reinforced brickwork4050 rub/m3
Reinforced brickwork (1/2 brick)3150 rub/m3
Additional cost when creating curved walls135 RUR/m2
Additional cost when installing arches2250 rub/piece
Laying screens and small brick structures with dilution of the composition and cutting of bricks9000 rub/m3
Decorative masonry of glass blocks 150 by 150 with grouting of joints180 rub/piece
Creating partitions from plasterboard with insulation (using a conventional frame)630 RUR/m2
Creation of partitions from plasterboard with insulation (using a special frame)1013 RUR/m2
Installation of plasterboard sheets over standard sheathing675 RUR/m2
Installation of plasterboard sheets over non-standard sheathing1350 rub/m2
Installation of communication rectilinear boxes made of gypsum plasterboard (in two layers)1350 rub/mp
Figured gypsum board cladding in several planes with the organization of niches, projections, pilasters1350 rub/m2
GKL cladding in one layer315 RUR/m2
Heat and sound insulation with rolled materials (5 cm)225 RUR/m2
Heat and sound insulation with mineral wool slabs (10 cm) on glue and dowels765 RUR/m2
Creation of frame walls and partitions from boards with cladding on both sides over a wooden frame1260 RUR/m2
Installation of prefabricated office partitions from prepared elements with glazing and organization of doorways (includes sealing of junctions)675 RUR/m2
Coating waterproofing with cement135 RUR/m2
Coating latex waterproofing180 rub/m2
Plastering and painting works
Plastering partitions with plaster630 RUR/m2
Plastering central fiber walls up to 5 cm360 rub/m2
Priming partitions before plastering45 RUR/m2
Additional fee for plastering curved surfaces270 RUR/m2
Plastering door and window slopes (up to 40 cm)585 rub/mp
Plastering door and window slopes (more than 40 cm)1440 RUR/m2
Installation of plaster mesh45 RUR/m2
Installation of painting mesh45 RUR/m2
Puttying for wallpapering495 RUR/m2
Puttying partitions before painting495 RUR/m2
W/C putty of non-standard shapes711 RUR/m2
Installation of non-woven material on partitions45 RUR/m2
Puttying slopes with installation of corners and mesh675 RUR/m2
Priming before puttying27 RUR/m2
Wallpapering for painting180 rub/m2
Pasting with vinyl wallpaper279 RUR/m2
Sticker of complex wallpaper900 rub/m2
Simple decorative coating720 RUR/m2
Complex decorative coating720 RUR/m2
The use of Venetian plaster and other complex decorative coatings900 rub/m2
Painting using a sprayer (“miliicolor”, “sabula” and others) on the finished surface495 RUR/m2
Additional cost when finishing complex surfaces225 RUR/m2
Painting partitions (depending on the number of layers and complexity of the work)315 RUR/m2
Additional cost when painting over textured wallpaper27 RUR/m2
Painting slopes225 RUR/m2

Finishing interior partitions

NamePrice per m2
Sheathing with plastic panels with the creation of a frame675 RUR/m2
Cladding with clapboard (wooden panels) with the creation of a frame270 RUR/m2
Tiling720 RUR/m2
Facing with complex tiles1170 RUR/m2
Tiling to look like natural stone1260 RUR/m2
Mosaic tile cladding
Mosaic panel finishing1290 RUR/m2
Decorating the border with marble pieces1755 RUR/m2
Decorative tile cladding1868 RUR/m2
Finishing with ready-made mirror canvases on glue without trimming1035 RUR/m2

Ceiling finishing

NamePrice per m2
Dismantling works
Removing a layer of paint and wallpaper80 rub/m2
Removing lime and chalk110 rub/m2
Removal of suspended ceilings with frame disassembly90 rub/m2
Removing the plaster layer135 RUR/m2
Removing plaster stucco45 rub/mp
Installation work
Slatted suspended ceiling405 RUR/m2
Suspended ceiling "Armstrong"540 rub/m2
Mirrored suspended ceiling1215 RUR/m2
Gypsum suspended ceiling in one plane (in a single layer)540 rub/m2
Complex suspended ceilings in several planes with a box around the perimeter with a curved border1620 rub/m2
Flat straight cornices made of gypsum plasterboard (up to 30 cm)765 rub/m.p.
Ceilings with decorative gypsum plasterboard1530 RUR/m2
Organization of decorative elements with the creation of a frame1530 RUR/m2
Lining the ceilings of balconies, verandas, terraces with plastic panels (with the creation of a frame)500 rub/m2
Creating holes in suspended ceilings360 rub/piece
Bitumen waterproofing (two layers)342 RUR/m2
Painting works
Leveling with gypsum mortar up to 1.5 cm675 RUR/m2
Leveling with gypsum mortar up to 3 cm720 RUR/m2
Leveling with gypsum mortar up to 5 cm810 rub/m2
Priming concrete ceilings54 RUR/m2
Installation of mesh on ceilings108 RUR/m2
Plastering ceilings (includes production of composition)1148 RUR/m2
Plastering curved surfaces1800 rub/m2
Gluing flat ceilings with mesh90 rub/m2
Pasting complex ceilings with mesh113 RUR/m2
Using improved putty on plaster383 RUR/m2
Final puttying of flat ceilings338 RUR/m2
Puttying complex decorative forms from gypsum plasterboard for painting900 rub/m2
Putty up to four layers for painting720 RUR/m2
Priming before puttying45 RUR/m2
Installation of parts of complex shapes180 rub/m2
Painting flat ceilings315 RUR/m2
Painting complex ceilings315 RUR/m2

Decor

NamePrice per m2
Decoration with decorative details from gypsum plasterboard810 rub/m.p.
Creation of decorative niches, shelves, boxes (with installation of embedded parts)855 rub/m.p.
Additional cost when creating arches675 rub/m.p.
Installation of wall and ceiling decorative wood beams650 rub/m.p.
Installation of prepared radiator grilles (wooden)400 rub/piece
Installation of polyurethane cornices (with processing of junctions)450 rub/m.p.
Installation of prepared gypsum rods and cornices (up to 5 cm)558 rub/m.p.
Installation of prepared gypsum rods and cornices (up to 15 cm)585 rub/m.p.
Installation of prepared ceiling rosettes made of gypsum and polyurethane675 RUR/piece
Installation of prepared columns, pilasters up to 3 m in size (includes fastening the base, capitals, puttying of junctions and preparatory work for finishing).3600 rub/piece
Installation of mirrors with lighting fixtures (up to 1 sq. m)1350 RUR/piece
Installation of laminated individual panels on a prepared base2700 rub/m2

Door openings, carpentry work

NamePrice per m2
Installation of wooden blocks with double-glazed windows in doorways990 RUR/m2
Installation of plastic blocks with double-glazed windows675 RUR/m2
Glazing of balconies and loggias with wooden blocks (with the creation of a frame)1913 RUR/m2
Installation of prepared metal drips270 rub/mp
Removing a wooden door block for further disposal450 rub/piece
Installation of a new single-leaf interior door with fittings3150 RUR/piece
Installation of a new double-leaf interior door with fittings3375 RUR/piece
Installation of blocks made of glass3375 RUR/piece
Installation of accordion type doors2250 rub/piece
Installation of the lock (together with handles)855 RUR/piece
Installation of stops250 rub/piece
Installation of a standard metal block with pin fastening3600 rub/piece

Plumbing work

NamePrice per m2
Installation of water supply and heating system pipes675 rub/mp
Laying sewer pipes made of polyvinyl chloride with fittings360 rub/mp
Checking the hydraulics of hot and cold water supply systems3150 RUR/syst
Removing the toilet315 RUR/piece
Removing the sink270 rub/piece
Bathtub disassembly1125 RUR/piece
Removing the washbasin270 rub/piece
Removing the mixer225 RUR/piece
Disassembling the sink base270 rub/piece
Installation of a bathtub without hydromassage function (includes connection to the water supply system)9000 rub/piece
Installation of a bathtub with a hydromassage function with connection to the water supply system13500 rub/piece
Installation and connection of a wall-hung toilet (includes production of a connection unit)6300 rub/piece
Installation and connection of a water heater4680 RUR/piece
Installation of bidet with mixer4050 rub/piece
Installation and connection of wall mixers2880 RUR/piece
Installation of meters1350 RUR/piece
Installation of a shower cabin without hydromassage function and without a steam generator6750 RUR/piece
Installation of a shower cabin with hydromassage function and a steam generator14850 RUR/piece
Installation and connection of a shower tray with the manufacture of sides4050 rub/piece
Installing cartridge filters2250 rub/piece
Installation of bathroom accessories990 RUR/kit
Installation of glass and plastic curtains for shower cabins3510 RUR/piece

Work on the heating system

NamePrice per m2
Removing batteries450 rub/piece
Analysis of pipes and connections27 rub/mp
Painting batteries315 RUR/piece
Dismantling and installation of batteries for painting work900 rub/piece
Installation of gas and water pipelines with bends405 rub/mp
Additional fee when installing in ready-made channels297 rub/mp
Laying pipes for heated floors306 rub/mp
Additional fee for corrugated installation90 rub/mp
Installation of liners in a working riser1440 RUR/piece
Organization of connections to equipment and closing sections for welding with bending900 rub/mp
Installation of shut-off valves630 rub/piece
Installation of thermal input with additional options9000 rub/piece
Installation of cast iron batteries3870 RUR/piece
Installation of batteries made of steel and aluminum without rearrangement3060 RUR/piece
Painting pipes150 rub/mp

Work on the ventilation system

NamePrice per m2
Installation of air ducts made of flexible corrugated hoses (includes installation of fittings)360 rub/mp
Creation of boxes for ventilation grilles with punched niches and connection to the air duct1800 rub/piece
Installation of ventilation grilles250 rub/piece

Electrical work

NamePrice per m2
Installation of socket boxes in a brick surface200 rub/piece
Installation of socket boxes in concrete surfaces270 rub/piece
Installation of socket boxes in hollow or sheathed walls160 rub/piece
Installation in a power socket box90 rub/piece
Installation in a socket box of a low-current socket160 rub/piece
Installation of a computer socket in a socket box250 rub/piece
Installation of dimmers in the socket box160 rub/piece
Installation of a switch in a socket box90 rub/piece
Installation of distribution box700 rub/piece
Installation and connection of the fan2700 rub/piece
Installing a power outlet on an electric stove700 rub/piece
Installation of lighting fixtures in eaves structures450 rub/mp
Installation of suspensions for lighting fixtures300 rub/mp
Installation of hooks for chandeliers and other similar devices1125 RUR/piece
Chandelier installation1600 rub/piece
Installation of wall lighting fixtures360 rub/piece
Installation of lighting fixtures with hole cutting270 rub/piece
Installation of lighting fixtures with a prepared hole on a wooden surface390 RUR/piece
Installation of Armstrong lighting fixtures360 rub/piece
Replacing circuit breakers3700 rub/piece
Installation and connection of an individual shield: charge counter, RAM5850 RUR/piece
Installation, connection, configuration of video intercom3400 rub/piece
Laying heated floors360 rub/m2
Installation and connection of a rheostat for heated floors930 rub/piece
Connecting electric bells680 RUR/piece
Laying hoses, creating grooves, grouting for hidden electrical wiring800 rub/mp
Installation of steel pipes for power lines with bending in walls and ceilings270 rub/mp
Installation of cable channel (more than 5 cm)300 rub/mp
Installation of hidden wiring in brick1000 rub/mp
Installation of hidden wiring in concrete with cutting grooves140 rub/mp
Installation of low-current wiring in brick with the creation of grooves70 rub/mp
Placing power wires without gating570 rub/mp
Creating open wiring for TV390 rub/mp
Installation of “Crab” for TV780 RUR/piece

Other works

NamePrice per m2
Creation of scaffolding360 rub/m2
Descent and ascent of building materials stairs (if there is no elevator cabin)3375 RUR/t
Additional cost for 5-10 fl.270 rub/hour/hour
Additional cost for 10-15 fl.270 rub/hour/hour
Lowering and lifting building materials (if there is a cargo elevator cabin)1350 rub/t
Collection, removal and loading of construction waste1913 RUR/t
Covering furniture and other surfaces with film so as not to be damaged during work23 RUR/m2
Wet cleaning after work25 rub/m2
Protective temporary covering of floors with hardboard and film with subsequent disassembly180 rub/m2

Additional work

There are situations when it is necessary to completely replace the system, which is not provided for by the regulations. If there is a need for this, they can be included in the annual schedule.

But for this there must be confirmation that the system has significant defects that require immediate correction. Such replacements are carried out without waiting for the overhaul of the apartment building. Funds for the work will be taken from the capital repair fund formed by the residents.

Sometimes management companies eliminate defects in the premises of a tenant’s apartment. This occurs when damage is caused to the owner by the actions or inactions of the management company’s employees. The costs are borne by the culprit, that is, the management company.

It will be important for you

We have been working since 2011 and during this time we have completed dozens of construction projects, some of them are in our portfolio. If you are choosing a contractor for your project, contact us and we will provide a free estimate.

Warranty – from 3 years!

Photo reports from the place

Free estimate

We resolve issues promptly

Cleaning up after ourselves

We meet deadlines

SRO approval, certificate of conformity GOST R ISO 9001-2015:

Rating
( 2 ratings, average 5 out of 5 )